No | Nama Peserta | K | B | A | T | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. RHF MALANG MELINTANG - 81.128.774.7-657.000 | |
|
||||||||
2 | CV. SIMBUANG BANGUN SARANA - 02.152.875.7-803.000 | |
|
||||||||
3 | CV. MANAKARRA TEKNINDO - 93.756.631.3-814.000 | Rp. 298.964.699,67 |
Rp. 298.964.699,67 |
1. Melampirkan status keterangan Wajib Pajak berdasarkan hasil Konfirmasi Status Wajib Pajak valid, namun hasilnya TIDAK VALID. 2. Tidak memenuhi elemen operasi keselamatan konstruksi, pada tabel analisis keselamatan pekerjaan (Job Safety Analysis), isian kolom urutan langkah pekerjaan tidak tepat, seharusnya berisi urutan langkah – langkan pekerjaan atap. | |||||||
4 | CV. ABADI TAMA MANDIRI OPTIMA - 90.403.605.0-805.000 | Rp. 268.592.612,30 |
Rp. 268.592.612,30 |
1. Tidak melampirkan status keterangan Wajib Pajak berdasarkan hasil Konfirmasi Status Wajib Pajak valid. 2. Tidak memenuhi elemen operasi keselamatan konstruksi, pada tabel analisis keselamatan pekerjaan (Job Safety Analysis), isian kolom urutan langkah pekerjaan tidak tepat, seharusnya berisi urutan langkah – langkan pekerjaan atap. 3. Petugas K3 an. IIM Munim melampirkan Sertifikat BIMTEK SMK3, dipersyaratkan Sertifikat Pelatihan K3 Konstruksi. | |||||||
5 | CV. MULIA KARYA PERSADA - 73.313.812.7-805.000 | |
|
||||||||
6 | alif pratama - 74.326.737.9-807.000 | |
|
||||||||
7 | CV. ANEKA - 02.008.873.8-813.000 | |
|
||||||||
8 | EXALT TO COITUS - 95.171.929.3-822.000 | |
|
||||||||
9 | CV. MARIASE - 90.675.130.0-813.000 | |
|
||||||||
10 | CV. Bulue Struktur Madani - 74.288.372.1-805.000 | |
|
||||||||
11 | CV. SOPPAINDO SINERGI ENGINEERING - 90.814.371.2-802.000 | |
|
||||||||
12 | CV. CIPTA KARYA DUABELAS - 86.123.371.6-805.000 | |
|
||||||||
13 | CV. KUSNUR MITRA KARYA - 71.892.713.0-805.000 | |
|
||||||||
14 | CV.PELITA MULTI SINERGI - 93.880.360.8-807.000 | |
|
||||||||
15 | CV. GALUNG LOMBOK INDAH - 31.675.124.7-814.000 | |
|
||||||||
16 | CV. ANUGERAH BERSAMA - 80.949.890.0-822.000 | |
|
||||||||
17 | CV. ABIZAR PRATAMA - 71.521.330.2-801.000 | |
|
||||||||
18 | cv pandu abi sejahtera - 03.089.316.8-813.000 | |
|
||||||||
19 | CV. ABI PERKASA - 72.546.568.6-813.000 | |
|
||||||||
20 | CV. PRIMA JAYA KONSTRUKSI - 31.815.924.1-814.000 | |
|
||||||||
21 | CV. SYAHRIYANDI ASHAR UTAMA - 73.576.933.3-809.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak